ANAMBRA POLICE COMMAND RECEIVES AND AUGMENTS IGP’S MONITORING UNIT OPERATIVES ON ENFORCEMENT OF POLICE PERSONNEL WITHDRAWAL FROM VIP ESCORT DUTIES IN THE STATE. (PHOTOS). #PRESS RELEASE.

Image
 ANAMBRA POLICE COMMAND RECEIVES AND AUGMENTS IGP’S MONITORING UNIT OPERATIVES ON ENFORCEMENT OF POLICE PERSONNEL WITHDRAWAL FROM VIP ESCORT DUTIES IN THE STATE The Anambra State Police Command today 8th December 2025 formally received operatives of the Inspector-General of Police (IGP)’s Monitoring Unit deployed to the state to ensure full implementation of the IGP’s directive on the withdrawal of police personnel from VIP escort and guard duties. The Commissioner of Police CP Ikioye Orutugu fwc mnips PhD reaffirmed the Command’s commitment to supporting the IGP’s reform efforts targeted at enhancing professionalism, discipline, and optimal deployment of police manpower nationwide. The CP noted that the withdrawal of these officers will help to strengthen public policing, improve response capacity, and ensure that more personnel are available for core policing duties across the state. He further assured the Monitoring Unit operatives of the Command’s full cooperation throughout th...

ROADS IN OGBARU,ANAMBRA WEST,AWKA NORTH WORRY ME- GOV. SOLUDO SAYS AS HE FLAGS OFF NINE ROADS IN OKPOKO.(PHOTOS).


Roads In Ogbaru, Anambra West, Awka North Worry Me - Governor Soludo Says As He Flags Off Nine Roads In Okpoko 



Anambra State Governor, Professor Chukwuma Soludo has flagged-off construction of nine roads in Okpoko, Ogbaru Council Area.

The roads include: Obodoukwu road Obodo-Owerri Road (5.77km) Oguagu- Ik Onuorah-Anumudu-Mgbua- Amazu-Owerri Road (2.97km) Edeh Road-School Road-Awalite - Ojoto-Owerri Road (1.48km) School Road- Umuobom Street-Ojoto Street Junction (0.58km) and Umuobom street-Ojoto Street Junction-Adazi-ani street- Owerri Road- (0.77km). 

Others are Umenweke street (Obodoukwu Junction)-Umeojiakor street ( School Rd Junction)-0.58km, (Ojoto Junction)-Anumudu (Mgbuka Amazu Junction)0.99km, Uzii st- Mission st (Awaited Junction) 0.54km and Anumudu street (ik Onuorah Junction )- Gmi Rd- 0.38km. 

These roads totalling 14.3 kilometers, signals the official flagged-off of road construction across the state.

Performing the function, Governor Soludo noted that during the campaign, images he saw in three local government areas including Ogbaru, Anambra West and Awka North were not appealing, which was why his administration took it upon itself to give life to Okpoko and the entire state.

He assured that the roads embarked upon by his administration will be strong and durable with life span of nothing less than twenty years.

Recall that Governor Soludo assured of building over 220 kilometer roads across the state before the end of this year. 

More photos below. 



Comments

Popular posts from this blog

SHAKIRA COVERS WOMEN'S HEALTH MAGAZINE,APRIL ISSUE.

INNOSON GIVES OUT BRAND NEW IVM G5 AND SALARY FOR LIFE TO THE MAN WHO PROPHESIED ABOUT HIS VEHICLE MANUFACTURING IN 1979.(PHOTO).

THE NEW OONI OF ILE-IFE,WILL NOT EAT THE HEART OF THE LATE OONI-PALACE CHIEFS.