AGF TO MEET SENATE PANEL ON TAX REFORM BILLS TODAY. (PHOTO).

Image
 AGF to Meet Senate Panel on Tax Reform Bills Today The Attorney General of the Federation and Minister of Justice, Lateef Fagbemi (SAN), is set to meet with the Senate today (Thursday) to review the Tax Reform Bills submitted by President Bola Tinubu to the National Assembly. Amid controversy surrounding the bills, especially from the North, President Tinubu had urged for calm and directed the AGF to engage with the National Assembly to resolve the issues. In response, the Senate established a panel to meet with the AGF. Although the meeting had been delayed due to changes in the Senate panel's membership and caucus discussions, a source from the Ministry of Justice confirmed that the meeting will proceed today. Senator Abba Moro, Chairman of the Senate Special Committee, also confirmed that both the AGF and Federal Inland Revenue Service (FIRS) Chairman, Zacch Adedeji, have been invited to the session. The Senate formed the committee to address unresolved issues in the Tax Reform...

DOUBTS OVER USE OF SECOND NIGER BRIDGE FOR YULETIDE. (PHOTO).



Doubts over use of Second Niger Bridge for yuletide

Despite the completion of the Second Niger Bridge connecting Onitsha, Anambra State in the Southeast and Asaba, Delta State in the South-South, there are indications that travellers and commuters would not be able to use the bridge before December as the access road at the Asaba end is yet to be constructed.

For those who had expected to ply the road to connect the ever-busy commercial city of Onitsha during the Christmas and New Year celebrations, that hope is dashed, at least for now, as they still would have to contend with the perennial traffic snarl, which is worse during the Yuletide.

The (First) Niger Bridge, constructed over 60 years ago, has become too narrow for the volume of traffic from Asaba to Onitsha and vice versa. Close to Christmas every year, many passengers and motorists are forced to sleep on the road inward Onitsha due to bottleneck on the bridge, compounded by indiscipline on the part of motorists, especially commercial drivers.

Though the access road/Onitsha-Owerri interchange is virtually completed, the bridge, for now, remains closed to traffic, except vehicles belonging to the contractor, Julius Berger Plc, which conveys workers from one end to the other as they put finishing touches on the long-awaited road.

When contacted to know when the bridge would be formally open to the public, the acting Controller of Works, Federal Ministry of Works and Housing, who is the resident engineer for the project, Oluwaseyi Martins, referred newsmen to the Abuja head office of the ministry. In Abuja, the enquiry was acknowledged, with a response being awaited.

Apart from the fact that the bridge has not been commissioned/inaugurated by President Muhammadu Buhari, as was expected even before now, it was gathered that funds for the second phase of the legacy project, which includes construction of the access road from close to around Asaba Airport in Delta State by Julius Berger Plc, have not been released and is not likely to be released before the end of the year.

More so, with the general elections around the corner attracting the most attention, it was not certain when funds would be released for the project to be completed and open to the public.

The other alternative, reconstruction of the narrow road at Oko, just before the old bridge inward Onitsha, which is narrow and with sharp bends, has not commenced. It is dangerous, as it is, to use the road, considering the volume and size of vehicles expected to ply it as a by-pass.

In March this year, the then Director in the Federal Ministry of Works and Housing and representative engineer for the bridge, Adeyemo Akanji, now retired, stated that the bridge was 91 per cent complete and the entire project about 83 per cent complete, including the roads and bridges.

He added: “On completion of the bridge, because it is not a stand-alone bridge, the ministry is thinking of doing a temporary connection via an access road around Oko in Delta State, just before the old bridge, to put it to immediate use, linking not just Onitsha, but also Owerri.”

During a visit to that road recently, engineers from Julius Berger were seen on ground undertaking mapping of the route and possibly how to align it. But it is uncertain if work on the road would start anytime soon, especially as most construction companies close operations for the year around middle of December.

At the peak of the flooding that ravaged parts of the Southeast and South-South, the road was impassable, as about 90 per cent of it was overtaken by flood on both sides for few weeks.

Some staff of the construction company, who did not want their names mentioned, confirmed it was unlikely that the bridge would be used this season, even though it has been completed, because the access road was yet to be constructed.

It was gathered that the contractor disengaged over 100 casual workers about two months ago as it scaled down work due to non-release of funds for construction of the access road in Delta State end.

Minister of Works and Housing, Mr. Babatunde Fashola, had during a press briefing in September, announced the completion of the bridge, but he was silent on when it would be inaugurated. He had stated: “Our priority is to open the Second Niger Bridge to traffic by December, so that those travelling for the season will do so at ease.”

“The link roads at the Onitsha axis of the bridge have also been completed. Where we are having issues is the link roads at the Asaba axis of the bridge. We are currently sorting issues relating to payment of compensation to affected communities, but, as I speak, engineers are on site working and the sand filling is ongoing.

“We are committed to opening the bridge to traffic by December and I can assure you that, with the level of work done, the set target will be met.”

The Second Niger Bridge was initially billed for completion last February, but was delayed by the COVID-19 lockdown and EndSARS protests, among others.

Anambra People reports

 

Comments

Popular posts from this blog

INNOSON GIVES OUT BRAND NEW IVM G5 AND SALARY FOR LIFE TO THE MAN WHO PROPHESIED ABOUT HIS VEHICLE MANUFACTURING IN 1979.(PHOTO).

SHAKIRA COVERS WOMEN'S HEALTH MAGAZINE,APRIL ISSUE.

SSANU, NASU THREATEN STRIKE OVER WITHHELD SALARIES. (PHOTO).