LAGOS COURT JAILS NOGASA CHAIR, FATUYI PHILLIPS 21 YEARS FOR N43. 5M FRAUD. (PHOTO). #PRESS RELEASE

Image
 Lagos Court Jails NOGASA Chair, Fatuyi Phillips 21 Years  for N43.5m Fraud    Justice Mojisola Dada of the Special Offences Court sitting in Ikeja, Lagos, on Monday, November 18, 2024, convicted and sentenced Fatuyi Yemi Philips, Chairman, Natural Oil and Gas Suppliers Association of Nigeria, NOGASA, to 21 years imprisonment for N43.5m fraud.   The Lagos Zonal Directorate of the Economic and Financial Crimes Commission, EFCC, on April 5, 2022, arraigned Philips alongside his firm, Oceanview Oil and Gas Limited, on a two-count charge bordering on obtaining money by false pretence to the tune of N43, 502,000.00   Count one reads: "Fatuyi Yemi Philips and Oceanview Oil and Gas Nigeria Limited, on or about the 28th day of September, 2016 at Lagos, within the jurisdiction of this Honourable Court, with intent to defraud, obtained the aggregate sum of N43, 502,000.00 from Elochukwu Okoye and Elebana Unique Ventures Nigeria Limited on behalf of WAPCIL Nigeria Limited under the false rep

LIGHT UP KWARA: FIRM RELEASES ROLL-OUT PLAN FOR PHASE 2.

Image result for kwara state governor              Rubitec Power Limited, one of the two firms executing Light-Up Kwara (LUK), the solar-powered streetlight project of the Kwara State government, has released a comprehensive installation roll-out plan for the second phase of the project.
The roll-out plan, which was made available by the State Ministry of Energy, indicated that civil works component and the streetlight installation will be covered in three phases over a period of six months.
For section 1, a total of 256 poles will be deployed, covering 8.70km of roads across three routes within the Metropolis, including Kulende Estate Junction – FCMB Murtala road, Maraba – Oja-Oba and General Roundabout – Oja-Oba.
While for section 2, 392 poles will be erected across six routes, covering 9.952km. The routes to be covered are Michael Imodu – Offa Garage, Offa Garage – Unity roundabout, Unity roundabout – FCMB Murtala, Geri Alimi – CAILS and other roundabouts within the Metropolis.The road length to be covered under the third phase is 6.36km with 196 poles installed across four routes including Emir’s road – Post Office, Balogun Fulani – Gambari, Yebmot roundabout – Adeta roundabout and Abdulkadir road, Ilorin.Image result for kwara state governor

Comments

Popular posts from this blog

INNOSON GIVES OUT BRAND NEW IVM G5 AND SALARY FOR LIFE TO THE MAN WHO PROPHESIED ABOUT HIS VEHICLE MANUFACTURING IN 1979.(PHOTO).

SHAKIRA COVERS WOMEN'S HEALTH MAGAZINE,APRIL ISSUE.

SSANU, NASU THREATEN STRIKE OVER WITHHELD SALARIES. (PHOTO).