‎‎NAF RECEIVES FIVE NEW HELICOPTERS AS FG ACCELERATES AIRPOWER MODERNISATION. (PHOTO).

Image
 ‎‎NAF RECEIVES FIVE NEW HELICOPTERS AS FG ACCELERATES AIRPOWER MODERNISATION ‎ The Nigerian Air Force (NAF) has taken delivery of five new helicopters as the Federal Government accelerates efforts to modernize Nigeria’s airpower capabilities and strengthen the Armed Forces’ capacity to respond effectively to contemporary security challenges.  ‎ ‎A statement by the Director of Public Relations and Information Air Commodore Ehimen Ejodame indicates that the platforms comprise three AW-109 Trekker B helicopters  and two H-125 helicopters. ‎ The three AW-109s, which form part of 10 recently acquired by the Federal Government, were received in Lagos on 15 September 2026, with the remaining seven expected to be delivered before the end of 2026. ‎ ‎The Chief of the Air Staff, Air Marshal Sunday Aneke, described the acquisition as another significant milestone in the Federal Government’s sustained investment in the modernization and re-equipment of the NAF noting that the new pl...

THIRD MAINLAND BRIDGE CLOSURE FOR MAINTENANCE TESTS NOW SHIFTED TO AUGUST 24.#PRESS RELEASE.

Image result for fashola
     FEDERAL MINISTRY OF POWER, WORKS AND HOUSING PRESS RELEASE
· As FG directs immediate deployment of trucks to 300-capacity trailer park as part of efforts to decongest Oshodi-Apapa Expressway
The three day closure of the Third Mainland Bridge for Investigative Maintenance Test earlier slated to begin on July 27, 2018, has been shifted to August 24 the Minister of Power, Works and Housing, Mr. Babatunde Fashola SAN, has announced. The Shutdown, earlier scheduled to last from July 27 to July 30 will now last from August 24 to August 26, 2018.
In a Press Statement, Fashola said the shift in the date was arrived at after due consultations with the Lagos State Government and wide deliberations with other relevant stakeholders adding that the date shift was done “in order to give succour and relief to the people of Lagos State and other inter-state road users and support the efforts of the State Government."
On the efforts to decongest the Oshodi-Apapa Expressway, Fashola said, in the short term, he has directed the immediate deployment of trucks to the trailer park being constructed by the Ministry with the capacity to accommodate about 300 trucks while construction works for the shoreline protection continues.
Also, the on-going palliative work on the sections of the Apapa-Oshodi Road , the on-going construction of the road leading to the Apapa Port from Ijora will soon be completed while the main exit route through Tincan – Oshodi – Oworonshoki is under procurement for award. When completed, the project will enable free flow of traffic in the axis.
Also following the visit of the Vice President, Professor Yemi Osinbajo, to Lagos in connection with the Apapa Port Gridlock, the Federal Government has said, as a short term measure, a call up system in the control of truck movement would be introduced adding that it would be initially manual while the long term digital and ICT based system would be developed and deployed. The Association of Truck Owners has agreed to manage the manual system with their members who are truck operators, government also said.
HAKEEM BELLO
SPECIAL ADVISER,
COMMUNICATIONS
TO THE HON. MINISTER  
24TH JULY, 2018
Image result for fashola

Comments

Popular posts from this blog

MUSICIAN HARRY-SONG,REVEALS THE FACE OF THE FEMALE FAN WHO IS THREATENING TO KILL HIM.{PHOTOS}.

INNOSON GIVES OUT BRAND NEW IVM G5 AND SALARY FOR LIFE TO THE MAN WHO PROPHESIED ABOUT HIS VEHICLE MANUFACTURING IN 1979.(PHOTO).

THE NEW OONI OF ILE-IFE,WILL NOT EAT THE HEART OF THE LATE OONI-PALACE CHIEFS.