COURT RESTRAINS RESIDENT DOCTORS FROM EMBARKING ON STRIKE. (PHOTO).

Image
 COURT RESTRAINS RESIDENT DOCTORS FROM EMBARKING ON STRIKE  The national industrial court Abuja division has restrained all members and agents of the national association of resident doctors from calling, directing, organizing, participating in, and embarking upon any form of industrial action.  Justice Emmanuel Danjuma Subilim gave the order in an interim injunction filed by the federal government through the office of the attorney general of the federation and minister of justice.  The court temporally barred members of the association from embarking on any form of strike, work stoppages, go-slows, picketing, or any other form of industrial protest or disruption. The association is equally restrained from taking steps preparatory to any form of industrial action from the 12th day of january, 2026. The interim order remains in force pending the hearing and determination of the motion on notice fixed for the january 21, 2026. The association had earlier threatened to...

COVID-19: LAGOS RELEASES GUIDELINES ON BUILDING CONSTRUCTION.{PHOTO}.#PRESS RELEASE.

No photo description available.
     Sequel to the gradual and controlled easing of the COVID-19 lockdown in the State, the Lagos State Government, through the Ministry of Physical Planning and Urban Development, has released updated guidelines relevant to building construction sites in the State.
The guidelines were listed in a statement issued on Friday by the Commissioner for Physical Planning and Urban Development, Dr. Idris Salako, who said that it had become expedient to provide additional directives to curtail the continuous spread of the Coronavirus on all construction sites in the State.
According to the Commissioner, having taken cognisance of the vital contribution of the Construction Industry to the economy of the State and the need to safeguard the sector, especially at this trying period, all construction sites must observe the new guidelines issued by the government.
He listed some of the guidelines to include: Conspicuous display of safety information about COVID-19 on-site; maintaining a register and daily records of all workers engaged on the site; daily monitoring and documentation of the health conditions of all workers on-site; limiting the number of workers per building construction site of 650sqm to 15; displaying the approved copy of the building design on site.
Others expectations include restricting the requests for stage inspection/certification of buildings to online process; provision of hand sanitiser and/or water receptacle for regular handwashing; use of Personal Protective Equipment, including facemask, by all personnel; observing physical distancing at all times and limiting the attendance at project meetings to 15 persons, among others.
Salako explained that the guidelines formed an update to the existing directives and regulations guiding construction sites in the State, noting that the list must be displayed visibly at strategic locations within the project site to guide compliance and guarantee the safety of workers as well as visitors to the site.
While warning that any defaulting construction site would be shut down immediately, he enjoined the general public to explore the online portal for the processing of their planning permits and other services of the Ministry of Physical Planning and Urban Development.
No photo description available.

Comments

Popular posts from this blog

SHAKIRA COVERS WOMEN'S HEALTH MAGAZINE,APRIL ISSUE.

INNOSON GIVES OUT BRAND NEW IVM G5 AND SALARY FOR LIFE TO THE MAN WHO PROPHESIED ABOUT HIS VEHICLE MANUFACTURING IN 1979.(PHOTO).

TINUBU ANNOUNCES ARRIVAL OF 4 U.S ATTACK HELICOPTERS. (PHOTO).