NIGERIAN MAN TAKES UP THE CHALLENGE TO BE BURIED ALIVE FOR 24HOURS.(PHOTO).

Image
 Nigerian man takes up the challenge to be bur!ed alive for 24hours A Nigerian man who identifies as Young C has embarked on a challenge to be buried alive in a coffin for 24 hours.  He made this known in a series of posts on his Instagram page on Wednesday,  stating that the stunt was genuine and not a hoax.  He announced his intention to broadcast live footage from the coffin at night. Sharing a video on his Instagram account on Wednesday, he said, "I am going to be spending the next 24 hours buried in this casket. Guys, this is real, not fake.  "And the most amazing part is that I am going to go live by night." In a subsequent update, Young C revealed that he had been buried for over 8 hours and was experiencing physical discomfort, including excessive sweating. In an update on Wednesday evening, he said in part, "Guys, I have been buried alive for over 8 hours now. For those of you who saw my first video, I have been down here. As you can see, my camera is still

OGUN BEGINS WORK ON OJODU ABIODUN, AKUTE ROAD - WORKS COMMISSIONER.{PHOTOS}.#PRESS RELEASE.

Image may contain: sky, car and outdoor
   The Ogun State Government has assured residents of Ojodu Abiodun, Akute in Ifo Local Government area of the State that the State Government would immediately commence work on the 4.65 kilometre road at the end of the current raining season, with a promise to deliver a brand new road.
The Commissioner for Works and Infrastructure, Engr. Ade Akinsanya who gave the assurance while speaking to newsmen shortly after inspecting palliative work on the road, said that the palliative work currently going on in the area was just a temporary measure to reduce the hardship of road users, adding that the road is part of the economic linkage the Prince Dapo Abidoun-led Administration in the State was looking to revitalise.
Aside the 4.65 kilometre Ojodu Abiodun/Akute road, Akinsanya also disclosed that the road coming from Sango to Akute, where the bridge can be seen would also be done, calling on the people of the State to be patient with the State Government in its resolve to make roads across the State motorable.
He emphasised that palliative works would be done on Ojodu Abiodun-Denro Ishashi-Ajuwon-Akute Alagbole-Yakoyo, and Alagbado-Oke Aro-Lambe-Matogun Roads and their environs.
"This road is a vital road. It is a road linking us with Lagos State. It is part of the economic linkage this Administration is trying to revitalise in this area. The new road is coming very soon. The design is ready. To make it motorable when it rains is the reason for the palliative work we are doing here today. There has been a lot of complaints on the road, but the Governor has directed us to make it motorable, even in the interim.
"There will be a brand new road linking this place to Lagos. It is a 4.65 kilometre road. At the same time, the road coming from Sango to Akute here where you see the bridge - that also will be done," he said.
A resident and pastor in charge of First Baptist Church, Akute, Reverend Ayo Ojeleye, while commending the State Government for the palliative work on the road, called on the Government to as a matter of urgency come to the aid of the people in the area.More photos below.
Image may contain: outdoorImage may contain: sky and outdoor

Comments

Popular posts from this blog

ACTOR BABA IJESHA APPEALS FIVE-YEAR JAIL SENTENCE FOR SEXUAL ASSAULT. (PHOTO).

INNOSON GIVES OUT BRAND NEW IVM G5 AND SALARY FOR LIFE TO THE MAN WHO PROPHESIED ABOUT HIS VEHICLE MANUFACTURING IN 1979.(PHOTO).

PUNISH MY ABUSERS WITHIN 48 HOURS OR FACE LAWSUIT- STUDENT BULLIED BY HER CLASSMATES THREATEN SCHOOL AUTHORITIES. (PHOTO).