CARRICK FAVOURITE FOR MAN UTD CARETAKER ROLE. (PHOTO)

Image
 Carrick favourite for Man Utd caretaker role Michael Carrick has emerged as favourite to be appointed Manchester United caretaker head coach, according to sources close to the process. Club chiefs are hoping to have an appointment in place for when players return to training on Wednesday. While a final decision is yet to be reached, talks are said to have progressed with the 44-year-old over the position. Carrick previously had a three-game stint as United's temporary boss following Ole Gunnar Solskjaer's dismissal in 2021. He won two and drew one of those matches but left after Ralf Rangnick's arrival as interim manager. Solskjaer held face-to-face discussions with the club on Saturday about a return. United sacked Ruben Amorim as manager after 14 months in the job on 5 January. Darren Fletcher, a former United and Scotland midfielder, was initially handed temporary responsibility for first-team affairs following Amorim's departure. United suffered an FA Cup third-rou...

ANSEC AWARD CONTRACT FOR THE RENOVATION OF THE CIVIL SERVICE COMMISSION BUILDING, FLOOD CONTROL ALONG THE DILAPIDATED UMUEZE-ANAM FEDERAL ROADS. (PHOTOS). #PRESS RELEASE.


 ANSEC AWARD CONTRACT FOR THE RENOVATION OF THE CIVIL SERVICE COMMISSION BUILDING, FLOOD CONTROL ALONG THE DILAPIDATED UMUEZE-ANAM FEDERAL ROADS



After due consideration of the memo presented by Mr. Paulinus Onyeka, Anambra State Commissioner for Housing, the 19th Anambra State Executive Council (ANSEC), has approved the award of a contract for the renovation of the Civil Service Commission Building. The renovation will be completed in three  (3) months from the date of mobilization by BID Engineering Ltd at the cost of Ninty-Two Million, Three Hundred and Twenty-Seven Thousand, Two Hundred and Thirty-five Naira (N92, 327, 235. 00).


The construction of culverts to control flooding and palliative works to ensure pleasurable movement of people, and farmers along the Umueze Anam - Umudora - Oromaetiti - Umueze - Nzam Road which is a Federal Road in Anambra West Local Government and other adjoining roads that have remained impassable for many years, especially during the rainy season was awarded. The contract went to Guxon Construction Company NIG. Ltd at the cost of Three Hundred and Twenty-Four Million, Four Hundred and Ninty-Six Thousand, Two Hundred and Seventy-Five Naira (N324, 496, 275. 00) and will be completed in eight (8) weeks from the date of mobilization to the site.


B and O Ltd won the contract for the construction of perimeter fencing measuring 1,471 m; stormwater drainage culverts and chain-like fences of the additional land at Agulu Lake, Agulu, Anaocha Local Government - at the cost of Three Hundred and Sixty Million, Two Hundred and Ninty-Eight Thousand, Nine Hundred and Two Naira, Twenty-One Kobo (N360, 298, 920. 21) . The job will be completed in four (4) months.


In a bid to ensure a decent accommodation for the army personnel stationed at Nawfija in Orumba local government area, ANSEC approved the contract for the reconstruction and furnishing of the Forward Operating Base of the Nigerian Army there. This will cost One Hundred and Forty-Five Million, Five Hundred and Ninty-One Thousand, Six Hundred and Ninty Thousand, and Five Kobo (N145, 591, 690. 05) and the job will be done by Stansol Synergy Ltd and will be completed in 8 weeks.


Signed

SIR PAUL NWOSU

Commissioner for Information 

July 1, 2024.

Comments

Popular posts from this blog

SHAKIRA COVERS WOMEN'S HEALTH MAGAZINE,APRIL ISSUE.

INNOSON GIVES OUT BRAND NEW IVM G5 AND SALARY FOR LIFE TO THE MAN WHO PROPHESIED ABOUT HIS VEHICLE MANUFACTURING IN 1979.(PHOTO).

TINUBU ANNOUNCES ARRIVAL OF 4 U.S ATTACK HELICOPTERS. (PHOTO).